Integrity, Inc. completed a two mile extension of the Arthur Ray Teague Parkway multi-use running and biking trail in Bossier City. The eight foot wide asphalt path was extended from the front of CenturyLink Center through the Red River National Wildlife Refuge to the boat launch. The $1.2 million project was funded by the Red River Waterway Commission. The project also included construction of a concrete retaining wall and a new pavilion within the Red River National Wildlife Refuge.

Integrity, Inc.  ~  6301 Linwood Avenue  ~  Shreveport, LA 71106  ~  (318) 861-4474

Custom Website Design by White Roof Interactive

Images converted using avif to png converter